Brookline Drainage and Grading

Regrading and new storm structures on a public site that had flooded twice in three years.

Brookline Drainage and Grading

Project Overview

The site drained toward the building instead of away from it, which is why it flooded. Regrading reversed the fall and new structures picked up the water at the low points rather than letting it pond against the foundation.

Work ran while the building stayed open, with temporary routes maintained for pedestrians and deliveries throughout.

  • Positive drainage away from the building restored
  • Four new structures tied to the existing main
  • Building open for the duration