Sitework

Surfaces That Outlast the Warranty

Proper base preparation, honest jointing and mix designs matched to the load. The parts nobody sees are the reason the surface holds.

Before You Get Three Bids

Ask every contractor these five questions. The answers separate the price from the value quickly.

Request an Estimate
How thick is the base?

Compacted aggregate depth and subgrade prep should be written into the proposal, not assumed.

What mix and what strength?

A parking area and a loading dock do not take the same design. Ask for the number.

Where are the joints?

Control joint spacing and depth determine where cracks land. Random cracking is a planning failure.

Who handles drainage?

Slope and water routing belong on the plan before the forms go in.

What is the cure schedule?

Traffic too early costs you years. We publish the dates in writing.