Oakfield Distribution Slab Pour

A hundred and forty thousand square feet of slab poured to a flatness spec set by the racking layout.

Oakfield Distribution Slab Pour

Project Overview

The racking layout drove the flatness spec, and the spec drove the pour sequence. Strips were laid out to keep joints out of the aisles where the lift traffic runs.

Pours ran early to beat the afternoon heat, with curing compound applied the same shift. Joints were saw cut on time, which is the part that gets skipped and causes the cracking.

  • One hundred forty thousand square feet
  • Joints kept out of lift aisles
  • Flatness verified before racking mobilized