Westport Tilt Up Panel Erection

Sixty two panels cast on the slab and set in nine days on a new distribution building.

Westport Tilt Up Panel Erection

Project Overview

Panels were cast on the building slab, which kept the casting beds off the surrounding site and out of the way of underground work. Sixty two panels, set in nine working days once the crane arrived.

Embeds and openings were laid out against the steel shop drawings before the first pour, so nothing had to be cored after the fact.

  • Sixty two panels set in nine days
  • Cast on slab, no separate casting beds
  • No field coring for embeds or openings